Restaurant Planning Permission UK 2026: 5 Checks Before You Sign

TS
Lin Wanning

In England, a shop becoming a restaurant stays inside Use Class E, so planning permission is not normally needed for the use itself, but an extraction flue, a sign or a condition on the old permission can still need the council's consent. Five checks to make before signing a lease, with England's statutory fees as read on 21 November 2026 and the decision, appeal and enforcement time limits.

What the film covers

Questions the film answers

Do I need planning permission to open a restaurant?

In England, a shop and a restaurant or cafe are both in Use Class E, so the Planning Portal says permission "will not normally be required" for the use itself. An extraction flue, a new sign or shopfront, or a condition on the old permission can still need consent. A pub or hot food takeaway is outside Class E. The council decides each case.

What is the change of use from shop to restaurant?

Under section 55(2)(f) of the 1990 Act, using a building for another purpose in the same class is not development. Shops and restaurants or cafes sit together in Class E in England, so the change is within one class. Work that goes with it, such as a flue or signage, is assessed separately, and a condition on the old permission can still apply.

Can I change a pub into a restaurant?

A pub is a sui generis use under article 3(6)(p). The Part 3 text read has Class AA for pub to drinking establishment with expanded food provision, and no class for pub to Class E. The route the sources point to is a full application at £578, as read on 21 November 2026. The council decides it.

Do cafes need planning permission?

A cafe selling food and drink mostly consumed on the premises is within Class E in England, the same as a restaurant, so cafe planning permission follows the same rules. A shop-to-cafe change within Class E does not normally need permission, while a flue, a sign or a condition on the old permission can.

How much does a restaurant planning application cost?

In England, a material change of use is £578 as read on legislation.gov.uk on 21 November 2026, with sums substituted on 1 April 2025 and no 1 April 2026 schedule found. A flue is £293 or £578 depending on its fee category, and an externally displayed sign needing express consent is £165. The council confirms the fee category.

How long does a planning decision take?

GOV.UK's guidance gives 8 weeks for most applications and 13 weeks for major development. The planning guarantee refunds the fee if a non-major application is undecided after 16 weeks, unless an extension was agreed. In the worked example, validation on 5 January 2027 gives 2 March 2027 at 8 weeks and 27 April 2027 at 16 weeks.